Net metering in Pakistan

Net metering lets an on-grid or hybrid solar system send surplus units to the grid through a bidirectional meter. The rules come from NEPRA and apply across Pakistan; the application goes to the distribution company (DISCO) that supplies your connection. We prepare the file, submit it and follow it up until the green meter is installed.

Which company handles your application

Your application goes to the company named on your electricity bill:

  • LESCO: Lahore, Kasur, Okara, Sheikhupura, Nankana
  • IESCO: Islamabad, Rawalpindi, Attock, Jhelum, Chakwal
  • FESCO: Faisalabad, Sargodha, Jhang, Toba Tek Singh
  • MEPCO: Multan, Bahawalpur, D.G. Khan, Rahim Yar Khan
  • GEPCO: Gujranwala, Sialkot, Gujrat, Narowal
  • PESCO, HESCO, SEPCO, QESCO, TESCO and K-Electric in their regions

The process, step by step

The exact steps change when NEPRA or the DISCO update their procedures, but generally:

  • Install a solar system with a grid-approved inverter
  • Prepare the application with documents and system details
  • Submit to your DISCO and pay the fees
  • Site inspection
  • Approval and licence formalities
  • Installation of the bidirectional (green) meter

Documents usually needed

Have these ready to avoid delays:

  • Copy of the owner's CNIC
  • Latest paid electricity bill in the owner's name
  • Proof of ownership or tenant permission
  • System details: panel, inverter and capacity
  • Single-line diagram and installer details (we prepare these)

Rates and rules change

The credit rate for exported units, the allowed system size compared to your sanctioned load and the billing method are set by NEPRA and have been revised over time. We confirm the current rules for your connection before you commit, so your savings estimate is realistic.

Frequently asked questions

Is net metering available all over Pakistan?

Yes. NEPRA's net metering rules apply to every distribution company, including LESCO, IESCO, FESCO, MEPCO, GEPCO and K-Electric. The application goes to the company on your bill.

How long does net metering take?

It depends on your DISCO's workload and whether the file is complete. A complete, correct file is the biggest factor in avoiding delays.

What is the net metering rate per unit?

The rate for exported units is set by NEPRA and has changed over time. We confirm the current rate for your connection before you invest.

Can I get net metering with a hybrid inverter?

Yes, if the inverter is approved for grid connection. It exports surplus units and still gives battery backup.