The net metering process, step by step
The exact steps can change when NEPRA or LESCO update their procedures, but the process generally looks like this:
- Install a solar system with an inverter approved for grid connection
- Prepare the application with the required documents and system details
- Submit to LESCO and pay the applicable fees
- LESCO inspection of the site and installation
- Approval and licence formalities
- Installation of the bidirectional (green) meter
Documents usually needed
Have these ready to avoid delays. We will tell you if anything else is required for your case.
- Copy of the owner's CNIC
- Latest paid electricity bill (in the owner's name)
- Proof of ownership or tenant permission
- System details: panel, inverter and capacity
- Single-line diagram and installer details (we prepare these)
Rates and rules change — check before you decide
The rate at which exported units are credited, the allowed system size compared to your sanctioned load, and the billing method are set by NEPRA and have been revised over time. Before you commit, we confirm the current rules for your connection so your savings estimate is realistic.
Frequently asked questions
How long does net metering take in Lahore?
It varies with LESCO's workload and whether the file is complete. A complete, correct file is the biggest factor in avoiding delays, which is why we prepare it for you.
Can I get net metering with a hybrid system?
Yes. A hybrid inverter that is approved for grid connection can export surplus units through a net meter while still giving you battery backup.
What is the net metering rate per unit?
The rate for exported units is set by NEPRA and has changed over time. We confirm the current rate for your connection before you invest.
Do I need net metering to use solar?
No. Solar reduces your bill even without it. Net metering adds value when your system produces more than you use during the day.